Power management stories
The chipmaker is boosting US investment as AI demand strains advanced capacity and pushes full-year spending higher.
Higher power USB-C designs face greater risk of damage from surges, with the new part aimed at laptops, docks and industrial gear.
Energy and cooling limits are becoming the real bottleneck for AI operators, as NVIDIA says Blackwell racks can lift output within fixed power budgets.
Short outages can now be covered for home offices and retail tills, as the compact range targets small devices across EMEA.
AI server operators could cut heat and power losses as Lotus Microsystems' module targets denser racks and faster load response.
Local AI processing and gaming rigs took centre stage as Gigabyte unveiled new motherboards, graphics cards and laptops for Computex.
Windows PCs with up to 128GB of unified memory could let developers and creators run larger AI models locally, Microsoft said.
AI data centre orders helped push worldwide silicon wafer shipments 13.1% higher in the first quarter, SEMI said.
The funding will help industrial operators cut diesel use and emissions without replacing existing power systems, especially at remote sites.
Against a backdrop of surging AI power demand, the chipmaker says tighter synchronisation can curb wasted energy and lift data centre efficiency.
The split design could help firms train larger AI models faster while cutting costs and response times for production workloads.
The software aims to curb AI job failures and GPU waste as enterprises push agentic workloads into production on Nutanix systems.
Industry can now test grid, EV charging and cybersecurity systems in a virtual setting before risking outages on live networks.
Tighter grid rules are pushing AI data centres towards site-level power smoothing, as Skeleton's system aims to cut connection sizes and protect uptime.
Software teams can run up to three times as many tests without adding space or power, Cambrionix said, as lab bottlenecks grow.
Heightened scrutiny over components and costs makes the hire significant as Vertiv seeks to keep data centre equipment flowing amid AI-driven demand.
New parking features aim to help Australian motorists capture evidence after damage or tailgating incidents, with prices from AUD $189.
Businesses struggling to turn AI pilots into production may opt for on-site systems as data gravity and cloud costs squeeze returns.
Crowds of more than 59,000 runners and spectators could leave phones struggling with calls, data and live tracking along the route.
Portable charging demand is pushing Rapoo into the laptop power bank market, with a 20,000mAh model priced at INR 4,499 in India.