Story image

Plugging the digital drain on the campus data center

27 Nov 17

2007 was the tipping point for smartphones and probably the last time bandwidth needs on college campuses were fairly predictable.

Business requirements then meant supporting administrative offices. Learning mainly called for connecting student and teacher computers. And on game day, people just watched the game.

Today, IT pros are scrambling as unprecedented digital demand strains networks and overwhelms unprepared data centers.

Digital Drain

Things have really escalated in the last 5 years.

I’ve heard a few IT pros from mid-sized colleges estimate a 900% increase in the number of connected devices they have to support.

Campus Technology reports that higher education IT leaders are also preparing for the use of robotic telepresence and artificial intelligence, and reimagining education via immersive learning through VR and AR.

Some universities are setting up highly connected innovation labs to enable “experiential learning.”

These emerging, connected technologies will soon become standard and place even more strain on infrastructures. If a bit of latency doesn’t seem dire, think again.

The digital capabilities of a higher education institution can impact enrollment.

Advice about choosing a college often includes “good computing infrastructure.” 

Research shows that the next generation of college students puts smartboards, digital textbooks, websites, online videos and game-based learning systems on top of their preferred digital learning tools list.

Then there’s storage to consider. The data center supports the housing of electronic records, online course materials and student assignments, not to mention facilitating data-intensive applications.

Many institutions are looking to gain insights from the big data generated from all this connectivity, so throw the need for analytics into this mix.

Beyond education, students also expect connectivity after hours. In fact, campus IT is discovering that some of the highest demand comes late into the night when students are watching YouTube or streaming Netflix.

Beyond students, massive amounts of fans on game days are also connecting from multiple devices. Altogether, this means colleges and universities must provide a complete digital experience.

Plugging the Drain

Plugging the drain and creating a digital-ready higher education data center can start with simplifying all this complexity with a lifecycle approach.

This method results in standardization, modernization and optimization which will, in turn, lower costs, mitigate risks and ensures all stakeholders remain untethered and online.

Depending on where you are in the lifecycle, you may want to consider implementing software to stay connected to the infrastructure, deploying integrated IT solutions and/or enabling remote data center control.

In addition, edge solutions move compute power closer to the user.

Article by Jeff Chabot, Schneider Electric Data Center blog

HPE extends cloud-based AI tool InfoSight to servers
HPE asserts it is a big deal as the system can drive down operating costs, plug disruptive performance gaps, and free up time to allow IT staff to innovate.
Digital Realty opens new AU data centre – and announces another one
On the day that Digital Realty cut the ribbon for its new Sydney data centre, it revealed that it will soon begin developing another one.
'Public cloud is not a panacea' - 91% of IT leaders want hybrid
Nutanix research suggests cloud interoperability and app mobility outrank cost and security for primary hybrid cloud benefits.
Altaro introduces WAN-optimised replication for VMs
"WAN-optimised replication allows businesses to continue working in the case of damage to on-premise servers."
DDN part of data mining mission on Mars
DataDirect Networks (DDN) today announced that it will be playing a role in one of NASA’s most critical missions.
Opinion: Data centre management can learn from the Navy
While a nuclear submarine may seem like a completely different beast from a data centre, the similarities in how they should be managed are striking and many.
14 milestones Workday has achieved in 2018
We look into the key achievements of business software vendor Workday this year
HPE building new supercomputer with €38m price tag
It will be installed at the High Performance Computing Center of the University of Stuttgart and will be the world's fastest for industrial production.